A Framework for Deception
Draft Report


7 AFFECTORS & BUFFERS. AFFECTORS & BUFFERS Affector -
7.0 General. - - -
7.03 - (Chemical) - GSR, sweat - -
7.05 - Muscle (Motor) - -
7.05.a - Physical movement - -
7.05.a.a - Body Language - -
7.05.b - Appearance changes - -
7.05.c - Involuntary muscle movements - -
7.05.c.a - Regular automatic (e.g., heart rate) - -
7.05.c.b - Idiosynchratic (subconsciously variable) - -
7.21 - (Acoustic) - Speech - -
7.AA Affector type (AA) specified as follows: Affector Types: - -
7.AA.01 Electromagnetic. - - -
7.AA.02 Acoustic. - - -
7.AA.03 Chemical. - - -
7.AA.05 Kinetic (Physical) (e.g., muscle). - - -
7.AA.1 DRIVE. - - -
7.AA.1.1 Coverage area. - - -
7.AA.1.2 Amplitude. - - -
7.AA.1.3 Capacity (Power). - Induce target to expend limited affector resource uselessly. Dummy ships full of balsa wood were used as decoys to induce submarines to attack, waste torpedos in continued attempts to sink them, and remain long enough to be targeted themselves.
7.AA.1.4 Precision. - - -
7.AA.1.4.1 Spacial. - - -
7.AA.1.4.2 Temporal. - - -
7.AA.21 Speech. - - -
7.AA.3 IMPLEMENT FEATURES (USE OF PRIMATIVES / CHARACTERISTICS). - - -
7.AA.3.1 Speed. - - -
7.AA.3.2 Accuracy. - - -
7.AA.5 IMPLEMENT THE WHOLE (GESTALT); Pattern generation USING TEMPLATES. - Capitalize on affector's inflexible action (speed or accuracy) when driven by preprogrammed (or automatic) routine (eg, a feint). (See also 2.3.1.2.1. Dependence on Automatic Processes.) -
7.AA.5.1 Speed & Response Time. - Capitalize on affector's speed limitations or response time (refractory period) in performing a task: An (illegal) scheme for 'borrowing' money is to cash a check on an empty account, covering it before the check clears by a check on a second empty account, and so on, and on, and on....
7.AA.5.1.a - - Influence target's free decision with a candid gesture or statement, the falseness of which will not be discovered until too late. -
7.AA.5.1.b - - Cause action from which target cannot recover in time to respond to our next action. -
7.AA.5.2 Accuracy. NOTE: 'DIRECT' (ORCHESTRATE), the process for the next higher level, is in EXEC. - - -
7.AA.7 Reference Values and Feedback. - - -
7.AA.7.A - - Cause change in reference position or equilibrium. -
7.AA.7.A.a - - fatigue selected affectors. Push your arms outward very hard against door jam for one minute. Then let them relax at your side. Although target will feel like target are remaining at your sides, target will begin to float up without conscious effort.
7.AA.7.B - - Delay feedback to make fb-dependent processes 'stutter'. Delayed auditory feedback of one's own speech makes one stutter.
7.AA.8 Buffer Memory. - - -
7.AA.9 Other. - - -
7.a - Output: signal, noise - -